section 02742 cold mix asphalt
Welcome to Cina QC

section 02742 cold mix asphalt.

02741-Asphaltic Concrete Pavement

Section 02742 – Prime Coat 5. Section 02743 – Tack Coat C. Referenced Standards: ... Cold aggregate bins and proportioning device. 2. Dryer. 3. Screens. ... material which has been cut away and lay new mix against fresh cut. F. When new asphalt is laid against existing or

Get Price

Standard Construction Specifications - City of Memphis ...

Section 02742-Cold-Mix Asphalt; Section 02750-Rigid Pavement-Portland Cement; Section 02760-Pavement Markings; Section 02770-Curb, Curb and Gutter, Water Table; Section 02775-Portland Cement-Concrete Sidewalks and Driveway; Section 02820-Chain-Link Fence; Section 02830-Concrete Retaining Walls, Coping Walls, and Steps; Section 02841-Metal Beam ...

Get Price

PROJECT SPECIFIC SURFACING REQUIREMENTS

Jan 01, 2017  SECTION 02742S PROJECT SPECIFIC SURFACING REQUIREMENTS Add Section 02742: PART 1 GENERAL 1.1 SECTION INCLUDES A. Required PG Asphalt Binder or emulsion B Required minimum asphalt binder content for SMA mixes C. Number of gyrations (N values) to use for Superpave Mix Design D. PCCP Pavement Texture Type

Get Price

02742 - Asphalt Concrete Pavement Repairs

Section Cover Page Section 02742 2000-03-22 Asphalt Concrete Pavement Repairs Use this Section to specify repairs to existing asphalt concrete pavement, including pavement overlays, slurry seals, sand seals, fog seals, and removal and replacement of relatively small areas of pavement.

Get Price

32 12 17 (02742) - Asphalt Concrete Pavement Repairs

.1 Mix and place asphalt concrete heated to temperatures between 121 and 163 degrees Celsius..2 Do not heat asphalt cement to above 175 degrees Celsius..3 Place asphalt concrete when ambient air temperature is at or above 5 degrees Celsius. 3.6 EQUIPMENT.1 Do not use pneumatic tire rollers with wobbly type wheels.

Get Price

32 12 17 (02742) - Asphalt Concrete Pavement Repairs

.1 Mix and place asphalt concrete heated to temperatures between 121 and 163 degrees Celsius..2 Do not heat asphalt cement to above 175 degrees Celsius..3 Place asphalt concrete when ambient air temperature is at or above 5 degrees Celsius. 3.6 EQUIPMENT.1 Do not use pneumatic tire rollers with wobbly type wheels.

Get Price

City of Cold Lake CONSTRUCTION STANDARDS REVISIONS

Section 02742 Hot Mix Asphalt Pavement Section 02745 Asphalt Prime Coat Section 02747 Asphaltic Concrete Curbs Section 02748 Reshaping Granular Roadbed ... Section 02764 Cold Plastic Pavement Markings Section 02767 Pavement Marking Removal Section 02770 Concrete Curbs Gutters, Sidewalks, Medians and Drainage Swales ...

Get Price

RECYCLED CRUSHED CONCRETE BASE COURSE PART 1 G E

1. Cut-back asphalt: MC30 following Section 02742-Prime Coat. 2. Emulsified petroleum resin: EPR-1 Prime following Section 02742 - Prime Coat. 2.06 MATERIAL MIX A. Design mix for minimum compressive strength of 650 psi at 14 days following TxDOT Tex-120-E unconfined compressive strength. B. Cement Ratio: Follow Paragraph 2.01A.

Get Price

CITY OF TOMBALL RECYCLED CRUSHED STANDARD

Cut-back asphalt: MC30 following Section 02742-Prime Coat. 2. Emulsified petroleum resin: EPR-1 Prime following Section 02742 - Prime Coat. 2.06 MATERIAL MIX . A. Design mix for minimum compressive strength of 650 psi at 14 days following TxDOT Tex- ... A. Mix following Paragraph 2.01A, with metering devices adding specified quantities of ...

Get Price

Table of Contents

02741 Hot-Mix Asphalt Paving 02742 Hot-Mix Asphalt Paving Details Mar 15, 2003 02751 Cement Concrete Paving 02780 Unit Pavers Jan. 3, 2012 02781 Unit Pavers Details Mar 15, 2003 02800 Miscellaneous Site Improvements Feb. 15, 2006 02801 Miscellaneous Site Improvements Details Jan. 3, 2012 02810 Irrigation Systems

Get Price

Section 02741 HOT MIX ASPHALT PAVEMENT Page 1 of 10

Section 02741 HOT MIX ASPHALT PAVEMENT Page 5 of 10 City of Prince Albert Master Specifications.4 The bituminous mix temperature at mixer discharge shall be controlled between low temperature of 130oC and a maximum high temperature of 150oC. .5 Mix Tolerances .1 All mixture furnished shall conform to the job mix formula within the

Get Price

SECTION 025422 COLD MIX LIMESTONE ROCK ASPHALT

SECTION 025422 COLD MIX LIMESTONE ROCK ASPHALT PAVEMENT (Class A) (S-33) 1. MATERIAL This specification shall consist of a surface course, a leveling-up course, or a combination of these courses as shown on plans, composed of a compacted layer of natural limestone rock asphalt, cold mixed with prescribed flux and shall be

Get Price

MasterFormat TM 1995 to MasterFormat TM 2004 April 1, 2006

UFGS Section Title as Published in January 2006 Preparing Activity Masterformat 2004 Number ... COLD-MIX) USACE 32 12 19 02703 HOT-MIX ASPHALT (HMA) FOR ROADS USACE 32 12 16 ... 02742 HOT MIX BITUMINOUS PAVEMENT NAVFAC 32 12 17 02744 BITUMINOUS ROAD-MIX SURFACE COURSE USACE 32 12 21

Get Price

UFGS MasterFormat 1995 to MasterFormat 2004 Conversion Table

stone matrix asphalt (sma) for airfield pavements: usace: 32 13 17 : 02741: bituminous concrete pavement: navfac: 32 10 00 : 02742: hot mix bituminous pavement: navfac: 32 12 17 : 02744: bituminous road-mix surface course: usace: 32 12 21 : 02745: bituminous surface treatment: usace: 32 12 11 : 02746: resin modified pavement surfacing material ...

Get Price

Chapter 4 Construction Details - California Department of ...

Section 39 Asphalt Concrete 4-3901 General 4-3901A Warm Mix Asphalt 4-3901B Rubberized Hot Mix Asphalt 4-3901C Paving Personnel 4-3901D Hot Mix Asphalt Quality Assurance Processes 4-3901D (1) Standard Quality Assurance Process 4-3901D (2) Statistical Pay Factor Quality Assurance Process 4-3902 Before Work Begins ...

Get Price

11.1 Hot Mix Asphalt Plants - US EPA

11.1 Hot Mix Asphalt Plants 11.1.1 General1-3,23, 392-394 Hot mix asphalt (HMA) paving materials are a mixture of size-graded, high quality aggregate (which can include reclaimed asphalt pavement [RAP]), and liquid asphalt cement, which is heated and mixed in measured quantities to produce HMA. Aggregate and RAP (if used) constitute over 92 percent

Get Price

Cold Mix Asphalt Concrete - Vulcan Materials

3/01/2017 cold-mix asphalt concrete – page 3 of 9 sds 3239-024-wt/mt Indication of immediate medical attention and special treatment needed: In general, emesis induction is unnecessary in high viscosity, low volatility products.

Get Price

COMPARISON OF WARM MIX ASPHALT AND HOT MIX

COMPARISON OF WARM MIX ASPHALT AND HOT MIX ASPHALT PAVEMENT BASED ... is between hot mix asphalt and cold mix asphalt, and the performance is close to HMA. The main ... presented later, the section of road concerned is 1 km long with a width of 16.5 m and three asphalt layers of 0.18 m total thick; the service life of the road is 15 years; and ...

Get Price

Asphalt mix design manual for South Africa

The increasing use of mix types that cannot be classified as conventional Hot-Mix Asphalt (HMA) and that require alternative design methods. Such mix types would include warm mix, cold mix, mixes with significant proportions of reclaimed asphalt, stone mastic

Get Price

RECYCLED CRUSHED CONCRETE BASE COURSE PART 1 G E

1. Cut-back asphalt: MC30 following Section 02742-Prime Coat. 2. Emulsified petroleum resin: EPR-1 Prime following Section 02742 - Prime Coat. 2.06 MATERIAL MIX A. Design mix for minimum compressive strength of 650 psi at 14 days following TxDOT Tex-120-E unconfined compressive strength. B. Cement Ratio: Follow Paragraph 2.01A.

Get Price

CITY OF TOMBALL RECYCLED CRUSHED STANDARD

Cut-back asphalt: MC30 following Section 02742-Prime Coat. 2. Emulsified petroleum resin: EPR-1 Prime following Section 02742 - Prime Coat. 2.06 MATERIAL MIX . A. Design mix for minimum compressive strength of 650 psi at 14 days following TxDOT Tex- ... A. Mix following Paragraph 2.01A, with metering devices adding specified quantities of ...

Get Price

UFGS MasterFormat 1995 to MasterFormat 2004 Conversion Table

stone matrix asphalt (sma) for airfield pavements: usace: 32 13 17 : 02741: bituminous concrete pavement: navfac: 32 10 00 : 02742: hot mix bituminous pavement: navfac: 32 12 17 : 02744: bituminous road-mix surface course: usace: 32 12 21 : 02745: bituminous surface treatment: usace: 32 12 11 : 02746: resin modified pavement surfacing material ...

Get Price

Chapter 4: Construction Details, Section 92: Asphalt ...

4-9201 General. Asphalt binder and modified asphalt binder, as defined in Section 92, “Asphalt Binders,” of the Standard Specifications, are also referred to as asphalt or paving asphalt. Modified asphalt binder is asphalt binder that has been modified with polymers, crumb rubber, or both. Asphalt binder is used in hot mix asphalt, in ...

Get Price

Hot-Mix Asphalt Plant Operations

HOT-MIX ASPHALT PAVING HANDBOOK 2000 FIGURE 5-1 Typical HMA batch plant. into the pugmill, and the wet-mix time begins. The mix­ ing time for blending of the asphalt cement with the ag­ gregate should be no more than that needed to com­ pletely coat the aggregate particles with a thin film of the asphalt cement material—usually in the range of

Get Price

Chapter 601 Pavement Design - IN.gov

Asphalt Binders. Kentucky rock asphalt is naturally occurring asphalt that has not been used in recent years but can be found within an existing pavement structure when coring the roadway. Sand surfaces were used extensively on asphalt pavements in the 1970’s and 1980’s. Both sand

Get Price

SECTION 330 HOT MIX ASPHALT - GENERAL

disturb the cover material before placing the asphalt mix, unless directed by the Engineer. 330-4.2 Tacking: Apply a tack coat on all existing pavement surfaces that are to be overlaid with an asphalt mix as specified in Section 300 and between successive layers of all asphalt mixes. Apply tack on a

Get Price

Facilities Engineering Design Requirements - FSC FACR

NFGS-02511 - Bituminous Hot Mix Pavement (S/S By Nfgs-02742) NFGS-02513 - Asphalt Concrete For Vehicular Traffic NFGS-02520 - Portland Cement Concrete Pavement For Roads And Airfields (S/S By Nfgs-02751) NFGS-02521 - Water Supply Well (S/S By Mil-Std-3007)

Get Price

Chapter 2 Asphalt and Asphalt Paving Materials

Cold mix asphalt may be used for surface, base, or subbase courses if the pavement is properly designed. Cold mix surface courses are suitable for light and medium traffic; however, they normally require a seal coat or hot Asphalt Concrete overlay as surface pro-tection. When used in the base or subbase, they may be suitable for all types of ...

Get Price

SECTION 401 - PLANT PRODUCTION

Section 400 HOT MIX ASPHALT SECTION 401 - PLANT PRODUCTION 401-1 DESCRIPTION. The contractor is responsible for Quality Control (QC). QC is defined as all activities required to produce HMA that meets all specification requirements. The contractor will incorporate a Quality Control system for all plant production of hot mix asphalt (HMA) and assume

Get Price

Cold Mix Asphalt - connect2local

Nov 21, 2018  You may have never realized it, but when paving contractors lay asphalt, they don't always do it the same way.Granted, every mixture is a combination of fine and coarse aggregate, as well as crude-oil-based products, but the mixing process and temperatures differ to create three distinct products: hot mix, warm mix, and cold mix asphalt.

Get Price

Read "Performance Specifications for Asphalt Mixtures" at ...

Suggested Citation:"Appendix D - Sample Documents Related to Performance Testing as Part of Specifications for Asphalt Mixtures (electronic format only, available online) ."National Academies of Sciences, Engineering, and Medicine. 2016. Performance Specifications for Asphalt Mixtures.Washington, DC: The National Academies Press. doi: 10.17226/23564.

Get Price

Edmonton (Alta.) - 2012 - Design and construction ...

Jan 01, 2012  Unit Price adjustments for high or low oil contents can be found in Hot Mix Asphalt Paving section 02741, Superpave Asphalt Paving Section 02742 and Stone Mastic Asphalt Paving Section 02743. 2.4 ...

Get Price

COH 2012 Standard Specifications PDF Pipe (Fluid ...

HOT MIX ASPHALT BASE ... 02741 02742 02743. FLEXIBLE PAVING ASPHALT CONCRETE PAVEMENT. ... Use cold joint with approved waterstop when manhole flow line depth exceeds 12 feet. No other joints will be allowed unless shown on Drawings. Wrap cold joints with external sealing material, minimum 6-inch with. ...

Get Price
Copyright © 2021.Cina QC All rights reserved.Cina QC